Greenville Waterline Replacement

Replacement of existing 10" waterline along Greenville with 12" waterline to support consumption needs.  Anticipated to be complete early 2010.

Hillside Water Storage Tank

The City will replace the 500,000 gallon elevated steel storage tank at Hillside Park with a 2 million composite (concrete stem with a steel tank) in 2008. This will be of a similar design as the recently completed tank on Prestige Circle. The tank will be the same height as the existing 500,000 gallon tank at Hillside Park. Design is complete. Construction has begun and is anticipated to be completed March 2011.

 

Main Street Waterline Replacement

Replacement of an aging waterline along Main Street.  Anticipated to be complete early 2010.

 

Timbercreek Sanitary Sewer Rehab

Design phase has begun. Construction is anticipated to begin December 2009.